Check out these Case Studies to learn how SYNCHRO has helped users boost productivity, save project costs, and streamline their heavy civil digital construction management.
Featured User Story
South Eastern Program Alliance (SEPA)
REMOVING 85 LEVEL CROSSINGS FOR SAFER TRAVEL AND REDUCTIONS IN ROADBLOCKS AND COLLISIONS ALONG A RAIL LINE
SYNCHRO helped teams visualize construction in 4D and cut development time to three months, minimizing traffic disruption. The 4D model enabled the team to develop construction staging plans 71.5% faster than with 2D diagrams.
Read more PDF Case Studies:
Project Controls Cubed (PC3)
ADVANCING WASTEWATER TREATMENT TO HELP RELIEVE MULTIYEAR DROUGHT IN SACRAMENTO
Project Controls Cubed (PC3) upgrades the Sacramento Regional Wastewater Treatment Plant, providing safe and reliable treated water for recycled water use while saving USD 400 million in budget.
Sisk
Revitalizing Dublin City Centre with Modern Mixed-use Building
Sisk Coordinates one of the largest retail and office development projects in Dublin City Centre, despite space limitations and many logistical challenges.
Danish Road Directorate
The Age of Digital Delivery
Danish Road Directorate uses SYNCHRO 4D with their new Infrastructure Plan 2035, raising the level for BIM in road, rail, and bridge construction in Denmark.
ACCIONA
Modernizing Melbourne’s Rail Infrastructure
ACCIONA Dramatically Reduces Staging Time and Drafting Requests To Deliver the Level Crossing Removal Program.
Solid Support
50% In Time Saved With 4D Simulation Of Bridge Construction
Solid Support Animates Australia's First Diagonal Arch Bridge Helping Win Bid for Construction Company
SKANSKA
High Profile M42 Junction 6 Scheme
Skanska Utilizes Virtual Construction Rehearsal to Ensure Seamless Bridge Installation on Busy Motorway
Clark Construction
Installation of the World’s Longest Pedestrian Walkway
Clark Construction Delivers Digital Construction Planning and Simulations of the World's Longest Pedestrian Walkway at Seattle-Tacoma Airport
WSB
Freeway Conversion and expansion
WSB Saves 3 Months and USD 12 Million Using SYNCHRO On Roadway Expansion Project
Tantek 4D
Construction of Tallest Modular-built High-rise in the World
Tantek 4D Uses SYNCHRO To Simulate and Successfully Manage Construction of Tallest Modular-built High-rise in the World
DPR
massive manufacturing upgrade of a drug plant
DPR Triples Production of Investigative Alzheimer’s Drug Saving Delivery Time by Six DaysMortenson
USD 1.4 BILLION CHASE CENTER ARENA PROJECT
Mortenson Saves 720 Resource Hours Using 4D Construction Modeling to Build USD 1.4 Billion Sports Destination Without Falling Behind Schedule