Check out these Case Studies to learn how SYNCHRO has helped users boost productivity, save project costs, and streamline their heavy civil digital construction management. 

Featured User Story

South Eastern Program Alliance (SEPA)

REMOVING 85 LEVEL CROSSINGS FOR SAFER TRAVEL AND REDUCTIONS IN ROADBLOCKS AND COLLISIONS ALONG A RAIL LINE

SYNCHRO helped teams visualize construction in 4D and cut development time to three months, minimizing traffic disruption. The 4D model enabled the team to develop construction staging plans 71.5% faster than with 2D diagrams.

SEPA Case Study Cover

Read more PDF Case Studies:

PC3 Case Study - Cover

Project Controls Cubed (PC3)

ADVANCING WASTEWATER TREATMENT TO HELP RELIEVE MULTIYEAR DROUGHT IN SACRAMENTO

Project Controls Cubed (PC3) upgrades the Sacramento Regional Wastewater Treatment Plant, providing safe and reliable treated water for recycled water use while saving USD 400 million in budget.

Sisk CS Cover

Sisk

Revitalizing Dublin City Centre with Modern Mixed-use Building

Sisk Coordinates one of the largest retail and office development projects in Dublin City Centre, despite space limitations and many logistical challenges.

Danish Road Directorate

Danish Road Directorate

The Age of Digital Delivery

Danish Road Directorate uses SYNCHRO 4D with their new Infrastructure Plan 2035, raising the level for BIM in road, rail, and bridge construction in Denmark.

Case-Study-ACCIONA-SYNCHRO-Dangerous-Level-Crossings-pdf

ACCIONA

Modernizing Melbourne’s Rail Infrastructure

ACCIONA Dramatically Reduces Staging Time and Drafting Requests To Deliver the Level Crossing Removal Program.

CS_Solid-Support_SYNCHRO-4D-pdf

Solid Support

50% In Time Saved With 4D Simulation Of Bridge Construction

Solid Support Animates Australia's First Diagonal Arch Bridge Helping Win Bid for Construction Company

SKANSKA Case Study png-2

SKANSKA

High Profile M42 Junction 6 Scheme

Skanska Utilizes Virtual Construction Rehearsal to Ensure Seamless Bridge Installation on Busy Motorway

Clark Construction

Clark Construction

Installation of the World’s Longest Pedestrian Walkway

Clark Construction Delivers Digital Construction Planning and Simulations of the World's Longest Pedestrian Walkway at Seattle-Tacoma Airport
WSB

WSB

Freeway Conversion and expansion

WSB Saves 3 Months and USD 12 Million Using SYNCHRO On Roadway Expansion Project
Tantek 4D

Tantek 4D

Construction of Tallest Modular-built High-rise in the World

Tantek 4D Uses SYNCHRO To Simulate and Successfully Manage Construction of Tallest Modular-built High-rise in the World
22DPR SYNCHRO 4D CS (1)-1-1

DPR

massive manufacturing upgrade of a drug plant
DPR Triples Production of Investigative Alzheimer’s Drug Saving Delivery Time by Six Days
Mortenson-1

Mortenson

USD 1.4 BILLION CHASE CENTER ARENA PROJECT

Mortenson Saves 720 Resource Hours Using 4D Construction Modeling to Build USD 1.4 Billion Sports Destination Without Falling Behind Schedule
SYNCHRO_Brand_Dials_122321

Learn how you can use SYNCHRO to deliver winning infrastructure construction projects all with one simple and intuitive platform.