Presented by:

Kenneth Allen, Designer, National Grid

Tom Diorio, Lead Designer, National Grid

Carlos Bodden, Designer, National Grid

Model real-world conditions to ensure clearances are met. Produce visualizations that allow internal stakeholders to better understand updates, reducing design time by weeks and lets the community see how updates affect their neighborhood.

Produce deliverables on time and ensure your drawings and models meet all required standards while reducing project design time by over 10 percent. Extend the reach of your deliverables by connecting natively to Bentley's open applications.

Grow your business with the power of MicroStation while taking advantage of flexible and affordable licensing options.

Cha'anling-Xiaojiazhou 220-kV Electric Transmission Line Project
POWERCHINA Hubei Electric Engineering Corporation initiated collaborative, 3D digital design to deliver the Cha'anling-Xiaojiazhou 220-kilovolt electric transmission line, saving CNY 6.2 million.
Sistemas Avanzados y Proyectos S.A de C.V Power Transmission Lines Project
Sistems Avanzados y Proyectos S.A. de C.V. needed to determine a precise path for the pylons and cables of a major power transmission line in Mexico to minimize environmental damage, reduce time, and increase safety.
/Virtuosity%20Branding/Virtuosity_Logo_200.png)